Les Rois

The project is located on the main axes far 500 meters from the American University at the intersection of Eltesein road south axis with the main display area next to the American University in the fifth district.

It's far by 10 minutes from Nasr City and 7 minutes from the intersection of Suez road with the ring road.

The project is surrounded by a road of width 90 meter from both sides including service side road specialized for the project of width 11 meter and the other two roads of width 50 meter.

The project is of 350 meter height from the sea level which makes a distinctive climate throughout the year.

The project mediates Katameya Dunes Resort & the East Town.

The project area of 170 acres of which 80% gardens and water lakes.

The project consists of 587 villas as well as 270 hotel units with a total constructive area of 13.5 % and surrounded by a fence of a length of 3.6 km.

The resort includes social club of area 7 acres (Smash Le Roi Club) as well as a mosque , commercial & administrative buildings.

Models of the villas include three styles (separate - Twin - Townhouse) with multiple models, all of which consist of (ground floor + first + roof) and represents a structural area of less than 40% from the area of the land which allows a space for the Garage - Swimming Pool – Garden.

Delivery specifications

Half finishing including all windows with aluminum surroundings – distinct interfaces made toddle Mex substance - Brick trim artificial stone – surrounded fence.

The available villas

First : Separate Villas ( 3 models)

  1. Rosa V5 – Buildings of area 425 meters on a different area of land ranging from 600 meters to 700 meters
  2. Pensee V8 - Buildings of area 515 meters on a different area of land ranging from 700 meters to 800 meters
  3. Orchid V6 - Buildings of area 665 meters on a different area of land ranging from 900 meters to 1000 meters
Model Total Land Area Total Area of First Floor Roof Area Total Building Area
Rosa V5 168 174 83 425
Pensee V8 226 212 77 515
Orchid V6 300 290 75 665

Second: New constructions in the third stage

Innovative models for some of the separate villas including added basement which allows out directly to the outer gardens of compound ( V5 walkout – building area of 639 meter).

Model Total Lower floor area (Basement) Total area of land Area of second floor & roof Total Building Area
V5 walkout 179 182 94+184 639

Tala

residential compound at 6 of October

ETLALAH

ETLALAH :
 project is located 400 meters from a slave of the Abbasid Square Pasha Street, the main street and chateaux and mediates the major axes of the most important: October Bridge - Salah Salem - Abbasid - Ahmed Said .
The project is just ten minutes from the Salah Salem Road and Mosque of the Merciful and mediates several vital areas (Heliopolis and Nasr City and Fatimid Egypt and the downtown area).
Overlooking the Faculty of Engineering, Ain Shams University and playgrounds Directorate of Education and is bounded on the west side of the Embassy of the State of Malaysia.
The project is surrounded by four major streets.
Look ... residential commercial project consists of four towers and includes the following:
- Number 2 Basement (garages) flat ground full.
- Ground shops and buildings entrances role.
- 9 Edouard frequent residential areas ranging from 140 m - 250 m
Finishes:
- Finishing residential units (external door / interfaces Aluminum / Ceramic flooring)
- Kitchen and Bathroom Ceramics (without plumbing fixture)
- Entrances to the buildings of the marble.
Services:
- Lifts and Elevators and relocation.
- Ground tanks and pumps lift.
- Fire extinguishing system completely.
- Security and escort.

Eshraqa

Site of the Project

The project is located in the first urban area in 6th of October city – plot number 20 nearby El Bashaier owned by the Housing & Development Bank.

Along the way of Mehwar 26 July – October and far about 10 minutes from Mall of Arabia, Shooting Club and Engineering Association Club.

Surrounds the project a road with width of 32 m from 3 sides and internal roads especially to the project of width 15 m.

The area of the project is 32 acres in which buildings are constructed over 24% of the project area and the remaining of the area is green spaces and internal roads and corridors buildings services.

Project Description

The project consists of 896 housing units, the area of units starts from 112 m and up to 219 m, through distinct five models of buildings with good ventilation for all units as each unit of the building allows two facets.

Each building consists of four floors , most of the apartments are of 3 bedrooms, reception, kitchen , from 2 to 3 bathrooms

Elevator for each building

Project Services

  • Commercial Mall consists of ground floor & two upper floors
  • Administrative & commercial mall
  • Mosque
  • Nursery

Finishing

  • Distinct finishing Interfaces with marble entrances
  • The apartments are half finishing (egg shell – outside door- interior doors- windows – balconies of aluminum )
  • Intercoms

Sheraton

-      Housing building located in the area of Sheraton Airport (piece number 4 – square 1258 y )
 
·        Site of the Project:
The building is located on the main axis width of 60 meters and the area of the ministers and near the Mall of Sun City and Carrefour and Wadi Degla Club  
 
·        Description of the building
 
-      Basement and four repeated floors
-      4 apartments in each floor
-      2 elevators
-      Down garage on the whole area of the land
 
·        Level of the the interface  finishing
 
-      Distinct painting for the interfaces
-      Aluminum windows
-      Entrances and staircases of marble
 
·        Level of the the interior  finishing
-      Outdoor for the apartment
-      Half finishing 

El Taamier

Site of the Project:

  • The project is located at 500 meter far from Elswah square in ELmataria general& street - & Palace Dome ( Saudi Arabia Buildings)
  • The projects is surrounded by four main roads which are ( Elmatatria general street – Teraat Elgabel street – Elswah street )
  • The project is 10-minute walk from Hadyek El Qoba Metro Station & 15 minutes from Gesr El Suez & Roksy Square in New Egypt.
  • Entrances & Exit of the building on the main road of width 30 m (2 way road)

Project Description:

  • The projects consists of 14 buildings each of basement - ground floor - shops – administrative floor - 10 floors.
  • The project consists of 560 residential units with areas ranging from 120-130 m (4 apartments in each floor).
  • Ground floor – commercial shops and separate entrance for each building
  • Four administrative offices in the administrative floor&
  • Marble entrance and 2 elevators for each building
  • Distinct Interfaces and aluminum windows
  • Overhead water tanks and lifting & pumps
  • For each building - fire extinguishing system and guard room

Features of the Housing Unit:

  • The Housing units starts from first floor till the tenth
  • Residential units with areas ranging from 120-130 m consisted of 3 bedrooms – reception – kitchen – 2 bathrooms
  • Each floor consists of 4 apartments with 2 elevators
  • The housing units see the main roads

Delivery specifications

  • Finishing includes all the windows
  • Aluminum balconies
  • the outside door
  • Frames of the interior doors
  • Electricity pipes & phones
  • The rooms flooring and reception are of Luxury Ceramic
  • Ceramic flooring and walls of kitchens and bathrooms
  • Lining paint of the wall
  • Equipped with natural gas, telephones, security services and 24-hour guard units.